“It took two of us a day and a half to complete. Component parts (floor, doors and roof beams) were assembled on the first half day. Walls and roof went up on the second day along with the preassembled doors, shelves and tool rack. Do not start walls unless you have a full day to complete. It is like a house of cards until the shelves and tool rack go in. You must have plywood flooring down before you can start walls. Floor must be square and level or holes don’t line up. If you follow the directions you will have a surprisingly sturdy structure. Diagrams could be more clear.”
“This storage shed is very hard to assemble. I had to hire someone to put it together and cost me $300. Some parts also came bent and scratched. very sharp as well. I got cut! Not recommended!!”